Wednesday, March 31, 2010

Reno day 21 - 31st March 2010





Today everything are almost finish.
But the electrical work is too wrong. They just any how do, not based on my drawing.
My vanity top is up also.
Now left only the solid top, mirror, and two bathroom doors.

Tuesday, March 30, 2010

Reno - day 20 - 30th March 2010



Today the kitchen is up. But the vanity top is still not yet done.

Thursday, March 25, 2010

Reno - day 17 - 25th March 2010



Reno - day 15 - 23rd March 2010




Gypsum was partially done.
Partition at foyer was up.
TV panel was up.
Tiling job for balcony was done.
Window grill were installed.
Ceiling at entrance and balcony was up.

Reno - day 10 - 18th March 2010


The shower area were changed already. The floor tiles job were done also.


Kitchen tiles were done partially without the fridge base.

Reno - day 7 - 15th March 2010



Door frame came already.
The tiles were done. But I realized that's something wrong.
The shower area were not correct. So I called the contractor and asked for changes.

Wednesday, March 24, 2010

Reno - day 5 - 13th March 2010


We bought the bathroom fixtures, toilet bowls and basin.

Bathroom's tiles were up.

Wednesday, March 10, 2010

Reno - day 2 - 10th March 2010

We went there because we need to change our air-con order from system 3 to system 4.

Now the air-con become so expensive...or the correct word is too expensive for me.

Mitsubishi heavy industry - system 3 : $2880 ( 3 x 9K BTU )

Mitsubishi heavy industry - system 4 : $4000 ( 3 x 9K BTU + 1 x 24K BTU )

We dropped by to our house and check the progress so far. The actually had done mostly of the hacking. The TV wall was no longer there, all the toilet tiles were not there. The connecting wall between master bedroom and common bedroom had hole already. The kitchen was done.




For hacking, it's very fast.

Reno - day 1 - 9th March 2010

This day, we were on site on 10.30am to do some knocking.

First time we did was rolling the pineapple. And he moved the small altar in front of the door to one of the trees down stairs.

11.15 am sharp, Niko started knocking at the first point at the fiture wall. And about 10 minutes later, he moved to common bedroom and started to knock at the second point.

My house - before owner moved out

These are the pictures of my house at original condition before the owner moved out.


Tuesday, March 9, 2010

AMETEK @ Singapore Airshow 2010

CIEFFE @ INTERSEC DUBAI 2010

Vatech @ IDEM 2010


Jurong Port @Breakbulk 2010