Wednesday, March 31, 2010
Reno day 21 - 31st March 2010
Today everything are almost finish.
But the electrical work is too wrong. They just any how do, not based on my drawing.
My vanity top is up also.
Now left only the solid top, mirror, and two bathroom doors.
Tuesday, March 30, 2010
Thursday, March 25, 2010
Reno - day 15 - 23rd March 2010
Reno - day 10 - 18th March 2010
Reno - day 7 - 15th March 2010
Wednesday, March 24, 2010
Wednesday, March 10, 2010
Reno - day 2 - 10th March 2010
We went there because we need to change our air-con order from system 3 to system 4.
Now the air-con become so expensive...or the correct word is too expensive for me.
Mitsubishi heavy industry - system 3 : $2880 ( 3 x 9K BTU )
Mitsubishi heavy industry - system 4 : $4000 ( 3 x 9K BTU + 1 x 24K BTU )
We dropped by to our house and check the progress so far. The actually had done mostly of the hacking. The TV wall was no longer there, all the toilet tiles were not there. The connecting wall between master bedroom and common bedroom had hole already. The kitchen was done.
For hacking, it's very fast.
Now the air-con become so expensive...or the correct word is too expensive for me.
Mitsubishi heavy industry - system 3 : $2880 ( 3 x 9K BTU )
Mitsubishi heavy industry - system 4 : $4000 ( 3 x 9K BTU + 1 x 24K BTU )
We dropped by to our house and check the progress so far. The actually had done mostly of the hacking. The TV wall was no longer there, all the toilet tiles were not there. The connecting wall between master bedroom and common bedroom had hole already. The kitchen was done.
For hacking, it's very fast.
Reno - day 1 - 9th March 2010
This day, we were on site on 10.30am to do some knocking.
First time we did was rolling the pineapple. And he moved the small altar in front of the door to one of the trees down stairs.
11.15 am sharp, Niko started knocking at the first point at the fiture wall. And about 10 minutes later, he moved to common bedroom and started to knock at the second point.
First time we did was rolling the pineapple. And he moved the small altar in front of the door to one of the trees down stairs.
11.15 am sharp, Niko started knocking at the first point at the fiture wall. And about 10 minutes later, he moved to common bedroom and started to knock at the second point.
Tuesday, March 9, 2010